4x4 coming Friday

My question is, I bought a Kreg 64”x64” table I put in some two by fours for bracing but I cut the two sheets of three-quarter inch plywood both at 32 inches wide but I did 70 for a length if you all have that table and have something done something similar where did you leave the overhang? I figured I would mount the switch and probably the spindle controller and whatever else on that overhang but I’d like to have this table fully put together before Friday when the machine gets here.

The spindle will not be here till Monday, so I figured go ahead and get everything set up on the table, but I’m just wondering where I should put that overhang any ideas?

This topic was automatically closed 30 days after the last reply. New replies are no longer allowed.