Anyone else having problems with the run screen? No progress showing

I had to reinstall GRBL this morning due to some errors I probably made while fixing another problem. I figured while I was at it, I should upgrade to the latest version - 9j. The machine is running well and its getting the G code correctly, homing correctly, etc. However, now the progress circle on the run screen isn’t progressing and if I stop a job the other buttons are all blank. I’m assuming this is due to the upgrade. Is anyone else having these problems?

You have to compile GRBL with line number reporting enabled or CM doesn’t get feedback about what line is actually running.

-Rob

Thanks Rob. I’ll have work on the GRBL upload.