Has anyone used the 5.1 pro 4x2 for flatening larger slabs that would require tiling?
I have never flattened a slab with tiling but it is possible. The key is the pass through to keep the slab level. The weight will tend to drop one end and raise the other depending on how long your slab is. So support the slab and make sure it is level with the bed.
If the slab is fairly twisted, it may take multiple flips.
I never tried that.
A long router sled maybe easier in the long run.
I am curious to see what other suggestions you get.
I have the S5 Pro 4x4, I will say it’s possible but highly inefficient.
The issue is once the stock is moved for the next tile operation you will have to ensure the flattened area is aligned with the same plane of the X and Y axis or the second tile will not have a co-planer level surface. You can at least get the tile level within itself. And in this case this is only one side of the material that would be machined. The only way I see this viable is to mount the stock on a sled, the stock fixed in position so there were no changes to the reference “sled” that would actually be moved for the tile operation.
I would not use this method unless it was the only method available. It is almost impossible to get an area “flat and level” when the machine cannot complete the process in one operation within the machines cut area without some type of sled. I would use a separate slab flattening process, I think more efficient than trying to setup a sled like one would use for flattening stock in a planer.