Another Tiling Question

I created a new tiling tool path. Each tile being 47" with .25 overlap. Zero XY in lower left. First tile cut no issue. Once the first job completed i moved the work piece down 47" loaded up the 2nd tile and went to hit start and it gave me an error that it was too far forward and would hit the limit. I ended up just re-zeroing the Y to be 6.3mm behind and it proceeded. Piece is a hare long but i can fix it. I have 2 more pieces to cut that are also Tile jobs and will not be easy to fix if they arent the correct size. How do you do this without hitting the front do to the overlap?

Your 2nd tile should be cutting down to Y -0.25 for the overlap, so your zero point needs to be at least 0.25" from the front hard stop.

2 Likes

Ok so basically i just need to move the work piece up at least .25" and zero everything there. Thats kinda what i was thinking just wanted to validate. Thanks

1 Like