Would be nice to have an estimated ‘Total Cut Time’ field in CC that aligns with what is shown in CM, either at the bottom of the Toolpath list or on the Simulation page. I often find myself adding up the listed times manually with each project to gauge my time to cut.
2 Likes
If we had a persistent default group & subgroups, you could have subtotals and grand total ![]()
1 Like