Starting a project above Z zero?

I could’ve swore that I had seen a formula on how to start above your Z zero. I’m trying to make a fixture that has 3 ops, so they’re all at different heights. Is this possible?

Yes, assuming one wants the origin set relative to the bottom of the stock, but one wants it above that, say a 1/2" thickness, position the machine at the bottom of the stock, then set zero, but enter 0.5" before setting the origin.

2 Likes